Filling Gaps - Estimated Finish 4 days
vinhoo
Global Mapper User
Global Mapper 16
Windows 8.1
16GB Ram
Processor: CPU @ 2.4GHz, Solid state hard drive
I want to end up with a DEM of bare earth.
Am I doing something wrong? How can I speed this up? The data set does not not seem very big to me.
Thanks
Windows 8.1
16GB Ram
Processor: CPU @ 2.4GHz, Solid state hard drive
- I have a .laz with just over 98 million points.
- I have automatically classified the ground points.
- I have R-clicked on the layer in the Control Center and selected Create Elevation Grid from 3D Vector Data
- I use DTM option and optimal spacing at 10
- It calculates the Grid
- Then it starts to Filling Gaps - but the Estimated Finish is ~ 4 days away!
I want to end up with a DEM of bare earth.
Am I doing something wrong? How can I speed this up? The data set does not not seem very big to me.
Thanks
Comments
-
Ok, so I let it run for 4 days and checked on it.
It was at 60% and said it needs another 2 days.
2014-10-12 09_08_56-Global Mapper v16.0 [64-bit] [+Lidar].jpg
Categories
- 12.7K All Categories
- 5.6K Features Discussion
- 342 Downloading Imagery
- 1.3K Elevation Data
- 380 Georeferencing Imagery Discussion
- 628 GM Script Language
- 53 User Scripts
- 113 GPS Features
- 414 Projection Questions
- 819 Raster Data
- 1.3K Vector Data
- 6.6K Support
- 177 Announcement and News
- 908 Bug Report
- 558 SDK
- 1.2K Suggestion Box
- 3.7K Technical Support
- 562 Other Discussion
- 129 GIS Data Sources
- 27 Global Mapper Showcase
- 233 How I use Global Mapper
- 107 Global Mapper Forum Website