View Single Post
Old 06-12-2008, 05:36 PM
kwmish kwmish is offline
Global Mapper User
 
Join Date: Jun 2008
Posts: 4
Thanks: 1
Thanked 0 Times in 0 Posts
Default

Mike,

The problem is I don't know what output datum I want until I read the datum of the source file. Each output datum for each image will needs to be determined when the source datum is read.

If I used a batch convertor with the datum option, I would have to set a single output datum.

In a batch script, can I read the source projection of an image and set the output datum, depending on the source projection?

Thanks,
Kathy
Reply With Quote